Jul
26
01:00PM

SGTN - Monthly Working Bee

Sat, 26 Jul 2014
from 1:00pm to 4:00pm

by Joel Rockes
Posted: over 10 years ago
Updated: over 10 years ago by
Visible to: public

Time zone: Melbourne
Reminder: 2 hours before
Ends: 04:00pm (duration is about 3 hours)

Sat. 1pm – 4pm at Wattle Drive just near the One Tree Hill Hotel.

After the success of the race at Spring Gully last weekend we are very keen to continue the construction of the green loop this Saturday.

The section we will be working on this weekend will allow another 300 or so meters of singletrack to be opened up for use. Depending on which way you are travelling it will be a steady climb or a flowing decent through some interesting rock formations. Parks Victoria will also drop by and it would be great to show them how much support we are receiving with a high volunteer turnout.

There are jobs and tools for everyone so you just need to turn up with some gloves and sturdy footwear. We even provide drinks and snacks for your hard work.

If you can’t get there until later just walk up to Bunyip dam and head left along the old fall-line track and you will be able to see us. Every hour working gets us closer to the completed loop.

Location

Wattle Drive, Spring Gully 3550